Sorry for the long delay. I had some password trouble with the blog that I just resolved for myself.
Anywho, news:

The shop is done. Here’s some pix. (Note, the white cabinet does have drawer fronts and cabinet doors now, and the shop lights have been wired up and installed.)
I also have all the materials needed except the fasteners for the engineering station side wall (the wall without the monitors.) Also, thanks to a great guy on the rpf, I also have all my plexi laser cut to exact dimensions for all my LCARS!! It should be arriving in a few days.
Soon I should be starting construction, though the weather has turned rather cold and even though it is insulated, I do not have heat going to the shop yet. That is on next years budget.





0 Responses to “Close to construction!”
Leave a Reply